Step 7
00:00:01.000 --> 00:00:05.000 line:16 position:50% align:center size:100%
Switch off the residual current circuit breaker.

Step 8
00:00:05.000 --> 00:00:09.000 line:16 position:50% align:center size:100%
Thread the cable from below through the strain-relief device.

Step 9
00:00:09.000 --> 00:00:14.000 line:16 position:50% align:center size:100%
Fasten the cap nut M32 of the strain-relief device.

Step 10
00:00:14.000 --> 00:00:19.000 line:16 position:50% align:center size:100%
Connect PE ground conductor.

Step 11
00:00:19.000 --> 00:00:30.000 line:16 position:50% align:center size:100%
Connect phase conductors L1, L2, L3 and neutral conductor N.

Step 12
00:00:30.000 --> 99:59:59.999 line:16 position:50% align:center size:100%
Secure the connected cables with a screwdriver. Observe the torque values marked on the side underneath the terminals.