LogoFronius Smart Meter 63A-1
  • en
    • Contact
    • Imprint
    • Terms and Conditions
    • Data privacy statement
    • 012-20022024
    • Safety rules
      • Explanation of safety notices
      • General
      • Environmental conditions
      • Qualified personnel
      • Copyright
      • Data protection
    • General
      • Device description
      • Symbols on the device
      • Positioning
    • Installation
      • Checklist for installation
      • Mounting
      • Protective circuit
      • Cabling
      • Connecting the data communication cable to the inverter
      • Terminating resistors - Explanation of symbols
      • Terminating resistors
      • Multi-meter system - Explanation of symbols
      • Modbus participants - Fronius SnapINverter
      • Multi-meter system - Fronius SnapINverter
      • Modbus participants - Fronius GEN24
      • Multi-meter system - Fronius GEN24 inverter
      • Menu structure
      • Setting the address of the Fronius Smart Meter
      • Reading the Fronius Smart Meter operating parameters
    • Start-up
      • Fronius SnapINverter
        • General
        • Connecting to the Fronius Datamanager
        • Configuring the Fronius Smart Meter as the primary meter
        • Configuring the Fronius Smart Meter as a secondary meter
      • Fronius GEN24 inverter
        • General
        • Installation using the web browser
        • Configuring the Fronius Smart Meter as the primary meter
        • Configuring the Fronius Smart Meter as a secondary meter
    • Technical data
      • Technical data
      • Fronius manufacturer's warranty

    Fronius Smart Meter 63A-1 Operating Instructions

    Checklist for installation
    Cabling
    Configuring the web interface
    Technical data

    Safety rules

    Explanation of safety notices

    DANGER!

    Indicates immediate danger.

    If not avoided, death or serious injury will result.

    WARNING!

    Indicates a potentially hazardous situation.

    If not avoided, death or serious injury may result.

    CAUTION!

    Indicates a situation where damage or injury could occur.

    If not avoided, minor injury and/or damage to property may result.

    NOTE!

    Indicates a risk of flawed results and possible damage to the equipment.

    1. Safety rules

    Explanation of safety notices

    DANGER!

    Indicates immediate danger.

    If not avoided, death or serious injury will result.

    WARNING!

    Indicates a potentially hazardous situation.

    If not avoided, death or serious injury may result.

    CAUTION!

    Indicates a situation where damage or injury could occur.

    If not avoided, minor injury and/or damage to property may result.

    NOTE!

    Indicates a risk of flawed results and possible damage to the equipment.

    1. Safety rules

    General

    The device has been manufactured in line with the state of the art and according to recognized safety standards. If used incorrectly or misused, however, it can cause:
    • Injury or death to the operator or a third party
    • Damage to the device and other material assets belonging to the operating company.
    All personnel involved in commissioning, maintenance, and servicing of the device must:
    • Be suitably qualified
    • Have knowledge of and experience in dealing with electrical installations and
    • Have fully read and precisely followed these Operating Instructions

    The Operating Instructions must always be at hand wherever the device is being used. In addition to the Operating Instructions, attention must also be paid to any generally applicable and local regulations regarding accident prevention and environmental protection.

    All safety and danger notices on the device:
    • Must be kept in a legible state
    • Must not be damaged
    • Must not be removed
    • Must not be covered, pasted or painted over

    The terminals can reach high temperatures.

    Only operate the device when all protection devices are fully functional. If the protection devices are not fully functional, there is a danger of:
    • Injury or death to the operator or a third party
    • Damage to the device and other material assets belonging to the operating company

    Any safety devices that are not fully functional must be repaired by an authorised specialist before the device is switched on.

    Never bypass or disable protection devices.

    For the location of the safety and danger notices on the device, refer to the section headed "General remarks" in the Operating Instructions for the device.

    Any equipment malfunctions which might impair safety must be remedied before the device is turned on.

    This is for your personal safety!

    1. Safety rules

    Environmental conditions

    Operation or storage of the device outside the stipulated area will be deemed as not in accordance with the intended purpose. The manufacturer accepts no liability for any damage resulting from improper use.

    1. Safety rules

    Qualified personnel

    The servicing information contained in these operating instructions is intended only for the use of qualified service engineers. An electric shock can be fatal. Do not carry out any actions other than those described in the documentation. This also applies to qualified personnel.

    All cables and leads must be secured, undamaged, insulated and adequately dimensioned. Loose connections, scorched, damaged or inadequately dimensioned cables and leads must be immediately repaired by authorised personnel.

    Maintenance and repair work must only be carried out by an authorised specialist.

    It is impossible to guarantee that bought-in parts are designed and manufactured to meet the demands made on them, or that they satisfy safety requirements. Use only original spare parts (also applies to standard parts).

    Do not carry out any alterations, installations, or modifications to the device without first obtaining the manufacturer's permission.

    Components that are not in perfect condition must be changed immediately.

    1. Safety rules

    Copyright

    Copyright of these operating instructions remains with the manufacturer.

    The text and illustrations are all technically correct at the time of printing. We reserve the right to make changes. The contents of the operating instructions shall not provide the basis for any claims whatsoever on the part of the purchaser. If you have any suggestions for improvement, or can point out any mistakes that you have found in the instructions, we will be most grateful for your comments.

    1. Safety rules

    Data protection

    The user is responsible for the safekeeping of any changes made to the factory settings. The manufacturer accepts no liability for any deleted personal settings.

    General

    Device description

    The Fronius Smart Meter is a bidirectional electricity meter which optimises self-consumption and records the household's load curve. In conjunction with the Fronius inverter, Fronius Datamanager and Fronius data interface, the Fronius Smart Meter provides a clear overview of a user's own power consumption.

    The meter measures the power flow to the loads or to the grid and forwards the information via the Modbus RTU/RS485 communication to the Fronius inverter.

    CAUTION!

    Observe and follow safety instructions!

    Failure to observe the safety instructions will result in damage to personnel and equipment.

    Switch off the power supply before establishing a mains connection.

    Observe the safety instructions.

    1. General

    Device description

    The Fronius Smart Meter is a bidirectional electricity meter which optimises self-consumption and records the household's load curve. In conjunction with the Fronius inverter, Fronius Datamanager and Fronius data interface, the Fronius Smart Meter provides a clear overview of a user's own power consumption.

    The meter measures the power flow to the loads or to the grid and forwards the information via the Modbus RTU/RS485 communication to the Fronius inverter.

    CAUTION!

    Observe and follow safety instructions!

    Failure to observe the safety instructions will result in damage to personnel and equipment.

    Switch off the power supply before establishing a mains connection.

    Observe the safety instructions.

    1. General

    Symbols on the device

    Technical data, markings and safety symbols are located on the Fronius Smart Meter. These must not be removed nor painted over. The notices and symbols warn of incorrect operation that could result in serious injury and damage to property.

    Symbols on the rating plate:

    CE mark
    The devices conform to all the requisite and relevant standards and guidelines that form part of the relevant EU directive, and are therefore permitted to display the CE mark.

    Regulatory Compliance Mark (RCM)
    Complies with all applicable regulatory requirements in Australia and New Zealand regarding safety and electromagnetic compatibility, as well as specific requirements for radio equipment.

    WEEE mark
    In accordance with European Directive 2012/19/EU on waste electrical and electronic equipment and its implementation in national law, used electrical devices must be collected separately and recycled in an environmentally responsible manner. Ensure that you return your used device to your dealer or obtain information regarding a local, authorised collection and disposal system. Failure to comply with this EU Directive may result in a negative impact on the environment and your health!

    1. General

    Positioning

    The Fronius Smart Meter can be installed at two possible locations in the system: at the feed-in point and at the consumption point.

    Placement at the feed-in point
    Fronius Smart Meter located at the feed-in point.

    Placement at the consumption point
    Fronius Smart Meter located at the consumption load.

    Installation

    Checklist for installation

    For installation information, see the following chapters:
    1Switch off the power supply before establishing a mains connection.
    2Mount the Fronius Smart Meter (see Mounting on page (→)).
    3Connect automatic circuit breakers or automatic circuit breakers and disconnectors (see Protective circuit on page (→)).
    4Connect the mains cable to the Fronius Smart Meter (see Cabling on page (→)).
    5Connect the output terminals of the Fronius Smart Meter to the Fronius inverter (see Connecting the data communication cable to the inverter on page (→)).
    6If necessary, set terminating resistors (see Terminating resistors on page (→)).
    7Tug on each wire and plug to make sure that they are securely connected to the terminal blocks.
    8Switch on the power supply to the Fronius Smart Meter.
    9Check the firmware version of the Fronius inverter. To ensure compatibility between the inverter and the Fronius Smart Meter, the software must always be kept up to date. The update can be started via the inverter web page or using Solar.web.
    10If several Fronius Smart Meters are installed in the system, set the address (see "Setting the address" under Setting the address of the Fronius Smart Meter on page (→)).
    11Configure and commission the meter (see Start-up on page (→)).
    1. Installation

    Checklist for installation

    For installation information, see the following chapters:
    1Switch off the power supply before establishing a mains connection.
    2Mount the Fronius Smart Meter (see Mounting on page (→)).
    3Connect automatic circuit breakers or automatic circuit breakers and disconnectors (see Protective circuit on page (→)).
    4Connect the mains cable to the Fronius Smart Meter (see Cabling on page (→)).
    5Connect the output terminals of the Fronius Smart Meter to the Fronius inverter (see Connecting the data communication cable to the inverter on page (→)).
    6If necessary, set terminating resistors (see Terminating resistors on page (→)).
    7Tug on each wire and plug to make sure that they are securely connected to the terminal blocks.
    8Switch on the power supply to the Fronius Smart Meter.
    9Check the firmware version of the Fronius inverter. To ensure compatibility between the inverter and the Fronius Smart Meter, the software must always be kept up to date. The update can be started via the inverter web page or using Solar.web.
    10If several Fronius Smart Meters are installed in the system, set the address (see "Setting the address" under Setting the address of the Fronius Smart Meter on page (→)).
    11Configure and commission the meter (see Start-up on page (→)).
    1. Installation

    Mounting

    The Fronius Smart Meter can be mounted on a 35 mm DIN rail. The housing comprises 2 modules according to DIN 43880

    1. Installation

    Protective circuit

    The Fronius Smart Meter is a hard-wired device and requires a disconnecting device (circuit breaker, switch or disconnector) and overcurrent protection (automatic circuit breaker).

    The Fronius Smart Meter consumes just 10-30 mA, so that the nominal capacity of all switches, disconnectors, fuses and/or automatic circuit breakers is determined by the wire gauge, mains voltage and required breaking capacity.

    • Switches, disconnectors and circuit breakers must be within sight and located as close as possible to the Fronius Smart Meter; they must also be easy to use.
    • Use automatic circuit breakers that are rated for max. 63 A.
    • To monitor more than one mains voltage, use connected automatic circuit breakers.
    • The automatic circuit breakers must protect the mains terminal, which is marked L1. In rare cases where the neutral conductor has overcurrent protection, the overcurrent protection device must interrupt both neutral and non-earthed cables concurrently.
    • The circuit protection/disconnecting device must satisfy the requirements of IEC 60947-1 and IEC 60947-3, as well as all national and local regulations for electrical systems.
    1. Installation

    Cabling

    WARNING!

    Danger from mains voltage.

    An electric shock can be fatal.

    Switch off the power supply before connecting the mains voltage inputs to the Fronius Smart Meter.

    IMPORTANT!
    Do not install more than one cable per screw terminal. If necessary, use terminal blocks.

    Current path connection cross-section:
    • Wire (rigid): min. 1 mm² / max. 16 mm²
    • Wire (flexible): min. 1 mm² / max. 10 mm²
    • Recommended torque: 1.2 Nm / max. 1.4 Nm
    Data communication and neutral conductor connection cross-section:
    • Wire (rigid): min. 0.05 mm² / max. 4 mm²
    • Wire (flexible): min. 0.05 mm² / max. 2.5 mm²
    • Recommended torque: 0.5 Nm / max. 0.8 Nm

    Connect each voltage cable to the terminal strip as shown in the graphic below.

    1. Installation

    Connecting the data communication cable to the inverter

    Fronius SnapINverter:
    Connect the data communication connections of the Fronius Smart Meter to the Fronius system monitoring in the inverter. Several Smart Meters can be installed in the system, see chapter Multi-meter system - Fronius SnapINverter on page (→).

    1Connect 35 to -.
    2Connect 34 to D-.
    3Connect 33 to D+.

    Fronius GEN24 inverter:
    Connect the data communication connections of the Fronius Smart Meter to the Modbus interface of the Fronius GEN24 inverter. Several Smart Meters can be installed in the system, see chapter Multi-meter system - Fronius GEN24 inverter on page (→).

    1Connect 35 to GND.
    2Connect 34 to M1-.
    3Connect 33 to M1+.

    NOTE!

    More information on successful commissioning.

    Note the following information about connecting the data communication cable to the inverter.

    Use cables of type CAT5 or higher.

    Use a mutual twisted cable pair for data lines that belong together (D+, D- and M1+, M1-).

    If the output cables are close to the mains cabling, use wires or cables that are designed for 300 V to 600 V (never less than the operating voltage).

    Use double-insulated or sheathed output cables when they are close to bare conductors.

    Use shielded twisted pair cables to avoid faults.

    The outputs of the Fronius Smart Meter are electrically isolated from hazardous voltages.

    1. Installation

    Terminating resistors - Explanation of symbols

    Inverter in the system
    e. g. Fronius Symo

    Meter - Fronius Smart Meter
    Terminating resistor R 120 Ohm is included in the scope of supply.

    Modbus RTU slave
    e. g. Fronius Ohmpilot, Fronius Solar Battery, etc.

    Terminating resistor
    R 120 Ohm

    1. Installation

    Terminating resistors

    Due to interference, it is recommended that terminating resistors are used as illustrated below to ensure proper functioning.

    * The terminating resistor on Fronius Smart Meters is installed between 33 and 34. The terminating resistor R 120 Ohm is included with the Fronius Smart Meter.

    1. Installation

    Multi-meter system - Explanation of symbols

    Grid
    supplies the loads in the system if insufficient power is being generated by the PV modules or supplied by the battery.

    Inverter in the system
    e. g. Fronius Primo, Fronius Symo, etc.

    Utility meter
    Measures the measurement data relevant for billing amounts of energy (in particular kilowatt hours of energy sourced from the grid and energy fed into the grid). Based on the relevant billing data, the electricity retailer will invoice the energy sourced from the grid and the purchaser of the surplus energy will reimburse the energy fed into the grid.

    Primary meter
    Records the system's load curve and provides measurement data for energy profiling in Fronius Solar.web. The primary meter also controls the dynamic feed-in control.

    Secondary meter
    Records the load curve of individual loads (e.g. washing machine, lamps, TV, heat pump, etc.) in the consumption branch and provides measurement data for energy profiling in Fronius Solar.web.

    Producer meter
    Records the load curve of individual producers (e.g. wind power plant) in the consumption branch and provides measurement data for energy profiling in Fronius Solar.web.

    Modbus RTU slave
    e. g. Fronius Ohmpilot, Fronius Solar Battery, etc.

    Loads in the system
    e. g. washing machine, lamps, TV, etc.

    Additional loads in the system
    e. g. heat pump

    Additional producers in the system
    e. g. wind power plant

    Terminating resistor
    R 120 Ohm

    1. Installation

    Modbus participants - Fronius SnapINverter

    A maximum of 4 Modbus participants can be connected to the Modbus terminal.

    IMPORTANT!
    Only one primary meter, one battery and one Ohmpilot can be connected per inverter. Due to the high data transfer of the battery, the battery occupies 2 participants.

    Example:

    Input

    Battery

    Fronius
    Ohmpilot

    Quantity
    Primary meter

    Quantity
    Secondary meter

    Modbus

    1

    0

    1

    1

    1

    2

    1

    3

    1. Installation

    Multi-meter system - Fronius SnapINverter

    If several Fronius Smart Meters are installed, a separate address must be set for each one (see Setting the address of the Fronius Smart Meter on page (→)). The primary meter is always assigned address 1. All the other meters are numbered consecutively with the address range from 2 to 14. Different Fronius Smart Meter power categories can be used in combination.

    IMPORTANT!
    Use max. 3 secondary meters in the system. To avoid interference, it is recommended to install the terminating resistors according to chapter Terminating resistors on page (→).

    Location of the primary meter in the consumption branch. *Terminating resistor R 120 Ohm
    Location of the primary meter at the feed-in point. *Terminating resistor R 120 Ohm
    The following must be observed in a multi-meter system:
    • Only assign each Modbus address once.
    • Terminating resistors must be positioned individually for each channel.
    1. Installation

    Modbus participants - Fronius GEN24

    The inputs M0 and M1 can be selected for this purpose. A maximum of 4 Modbus participants can be connected to the Modbus terminal on inputs M0 and M1.

    IMPORTANT!
    Only one primary meter, one battery and one Ohmpilot can be connected per inverter. Due to the high data transfer of the battery, the battery occupies 2 participants.

    Example 1:

    Input

    Battery

    Fronius
    Ohmpilot

    Quantity
    Primary meter

    Quantity
    Secondary meter

    Modbus 0
    (M0)

    0

    4

    0

    2

    0

    1

    Modbus 1
    (M1)

    1

    3

    Example 2:

    Input

    Battery

    Fronius
    Ohmpilot

    Quantity
    Primary meter

    Quantity
    Secondary meter

    Modbus 0
    (M0)

    1

    3

    Modbus 1
    (M1)

    0

    4

    0

    2

    0

    1

    1. Installation

    Multi-meter system - Fronius GEN24 inverter

    If several Fronius Smart Meters are installed, a separate address must be set for each one (see Setting the address of the Fronius Smart Meter on page (→)). The primary meter is always assigned address 1. All the other meters are numbered consecutively with the address range from 2 to 14. Different Fronius Smart Meter power categories can be used in combination.

    IMPORTANT!
    Use max. 7 secondary meters in the system. To avoid interference, it is recommended to install the terminating resistors according to chapter Terminating resistors on page (→).

    Location of the primary meter in the consumption branch. *Terminating resistor R 120 Ohm
    Location of the primary meter at the feed-in point. *Terminating resistor R 120 Ohm
    The following must be observed in a multi-meter system:
    • Connect the primary meter and the battery to different channels (recommended).
    • The remaining Modbus participants must be distributed equally.
    • Only assign each Modbus address once.
    • Terminating resistors must be positioned individually for each channel.
    1. Installation

    Menu structure

    A graphic view of the menu structure can be found in the User Information that is supplied as standard.

    1. Installation

    Setting the address of the Fronius Smart Meter

    Symbol

    Name

    Event

    Function

    Prog

    1 x   

    Increases the set value

    Prog

    2 seconds   

    Proceeds to the next menu item

    1Press "Prog" for 2 seconds to call up code entry.
    2Enter the password "2633". Increase the value with "Prog".
    3Press "Prog" for 2 seconds to change to the menu item "Ad" (address).
    4Set the relevant address.
    • Permissible values: 1 - 14

    IMPORTANT!
    Skip all other settings and leave them unchanged.

    1. Installation

    Reading the Fronius Smart Meter operating parameters

    Symbol

    Name

    Event

    Function

    Prog

    1 x   

    Continue to the next screen

    Prog

    2 seconds   

    Reset value / switch to basic settings

    The following illustrations are symbolic representations. The values displayed vary for each individual unit.

    Display

    Description

    Total active energy consumed

    Total active energy produced

    Press for 2 seconds to reset the value

    Total reactive energy

    Partial reactive energy

    Current

    Press for 2 seconds to reset the value

    Voltage

    Effective power

    Reactive power

    Apparent power

    Frequency

    Power factor

    Operating hours

    Press for 2 seconds to reset the value

    Display

    Description

    Internal operating data

    Press to return to the "Total active energy consumed" display.

    Press for 2 seconds to go to the basic settings

    Protocol communication

    Address RS485

    Speed RS485

    Parity bit

    Version

    Start-up

    Fronius SnapINverter

    General

    IMPORTANT! Settings under the "Meter" menu item are only to be made by trained and qualified personnel!

    The service password must be entered in order to access the "Meter" menu item.

    Three-phase or single-phase Fronius Smart Meters can be used. In both cases, the selection is made under the "Fronius Smart Meter" item. The Fronius Datamanager automatically identifies the meter type.

    A primary meter and several secondary meters can be selected. The primary meter needs to be configured first before a secondary meter can be selected.

    1. Start-up

    Fronius SnapINverter

    General

    IMPORTANT! Settings under the "Meter" menu item are only to be made by trained and qualified personnel!

    The service password must be entered in order to access the "Meter" menu item.

    Three-phase or single-phase Fronius Smart Meters can be used. In both cases, the selection is made under the "Fronius Smart Meter" item. The Fronius Datamanager automatically identifies the meter type.

    A primary meter and several secondary meters can be selected. The primary meter needs to be configured first before a secondary meter can be selected.

    1. Start-up
    2. Fronius SnapINverter

    General

    IMPORTANT! Settings under the "Meter" menu item are only to be made by trained and qualified personnel!

    The service password must be entered in order to access the "Meter" menu item.

    Three-phase or single-phase Fronius Smart Meters can be used. In both cases, the selection is made under the "Fronius Smart Meter" item. The Fronius Datamanager automatically identifies the meter type.

    A primary meter and several secondary meters can be selected. The primary meter needs to be configured first before a secondary meter can be selected.

    1. Start-up
    2. Fronius SnapINverter

    Connecting to the Fronius Datamanager

    Access point:

    Ihr Browser kann diesen Film leider nicht anzeigen.
    1.
    Navigate to settings (Setup).
    2.
    Navigate to WiFi Access Point.
    3.
    Network and password are displayed.
    4.
    Activate WiFi Access Point.
    1Select the "Setup" menu on the inverter display and enable the "Wi-Fi Access Point".
    2Establish the connection to the inverter in the network settings (the inverter is displayed with the name "Fronius_240.XXXXXX").
    3Password: Enter 12345678 and confirm.
    4In the browser address bar, enter and confirm the IP address http://192.168.250.181 and confirm.

    The Fronius Datamanager start page is displayed.

    LAN:

    1Connect the Fronius Datamanager and computer to a LAN cable.
    2Place the Fronius Datamanager IP switch in the 'A' position.
    3In the browser address bar, enter and confirm the IP address http://169.254.0.180 and confirm.
    1. Start-up
    2. Fronius SnapINverter

    Configuring the Fronius Smart Meter as the primary meter

    1Go to the Fronius Datamanager website.
    - Open the web browser.
    - In the address bar of the browser, enter the IP address (IP address for WLAN: 192.168.250.181, IP address for LAN: 169.254.0.180) or the host and domain name of the Fronius Datamanager and confirm.
    - The Fronius Datamanager website will be displayed.
    2Click the "Settings" button.
    3Log in to the login area with the "service" user and the service password.
    4Call up the "Meter" menu area.
    5Select the primary meter from the drop-down list.
    6Click the "Settings" button.
    7In the pop-up window, set the position of the meter (feed-in point or consumption point). For more information on the position of the Fronius Smart Meter, see Positioning on page (→).
    8Click the "Ok" button when the OK status is displayed. If the Timeout status is displayed, try again.
    9Click the    button to save the settings.

    The Fronius Smart Meter is configured as a primary meter.

    The "Current general view" menu area displays the power of the PV modules, self-consumption, the energy fed into the grid and the battery charge (if available).

    1. Start-up
    2. Fronius SnapINverter

    Configuring the Fronius Smart Meter as a secondary meter

    1Go to the Fronius Datamanager website.
    - Open the web browser.
    - In the address bar of the browser, enter the IP address (IP address for WLAN: 192.168.250.181, IP address for LAN: 169.254.0.180) or the host and domain name of the Fronius Datamanager and confirm.
    - The Fronius Datamanager website will be displayed.
    2Click the "Settings" button.
    3Log in to the login area with the "service" user and the service password.
    4Call up the "Meter" menu area.
    5Select the secondary meter from the drop-down list.
    6Click the "Add" button.
    7Enter the name of the secondary meter in the "Name" input field.
    8Enter the previously assigned address in the "Modbus address" input field.
    9Add meter description.
    10Click the    button to save the settings.

    The Fronius Smart Meter is configured as a secondary meter.

    1. Start-up

    Fronius GEN24 inverter

    General

    IMPORTANT! Settings under the "Device configuration" menu item are only to be made by trained and qualified personnel!

    The technician password must be entered in order to access the "Device configuration" menu item.

    Three-phase or single-phase Fronius Smart Meters can be used. In both cases, the selection is made under the "Components" menu area. The meter type is determined automatically.

    A primary meter and several secondary meters can be selected. The primary meter needs to be configured first before a secondary meter can be selected.

    1. Start-up
    2. Fronius GEN24 inverter

    General

    IMPORTANT! Settings under the "Device configuration" menu item are only to be made by trained and qualified personnel!

    The technician password must be entered in order to access the "Device configuration" menu item.

    Three-phase or single-phase Fronius Smart Meters can be used. In both cases, the selection is made under the "Components" menu area. The meter type is determined automatically.

    A primary meter and several secondary meters can be selected. The primary meter needs to be configured first before a secondary meter can be selected.

    1. Start-up
    2. Fronius GEN24 inverter

    Installation using the web browser

    WLAN:

    1Open the access point by touching the sensor    → Communication LED flashes blue.
    2Establish the connection to the inverter in the network settings (the inverter is displayed with the name "FRONIUS_" and the serial number of the device).
    3Enter the password from the rating plate and confirm.
    IMPORTANT!
    To enter the password on a Windows 10 operating system, the link "Connect using a security key instead" must first be activated to establish a connection with the password.
    4In the browser address bar, enter and confirm the IP address 192.168.250.181. The installation wizard is opened.
    5Follow the installation wizard in the individual sections and complete the installation.
    6Add system components in Solar.web and start up the PV system.

    The network wizard and the product setup can be carried out independently of each other. A network connection is required for the Solar.web installation wizard.

    Ethernet:

    1Establish a connection to the inverter (LAN1) with a network cable (CAT5 STP or higher).
    2Open the access point by touching the sensor once    → Communication LED: flashes blue.
    3In the browser address bar, enter and confirm IP address 169.254.0.180. The installation wizard is opened.
    4Follow the installation wizard in the individual sections and complete the installation.
    5Add system components in Solar.web and start up the PV system.

    The network wizard and the product setup can be carried out independently of each other. A network connection is required for the Solar.web installation wizard.

    1. Start-up
    2. Fronius GEN24 inverter

    Configuring the Fronius Smart Meter as the primary meter

    1Access the inverter website.
    - Open the web browser.
    - In the address bar of the browser, enter the IP address (IP address for WLAN: 192.168.250.181, IP address for LAN: 169.254.0.180) or the host and domain name of the inverter and confirm.
    - The inverter website is displayed.
    2Click the "Device configuration" button.
    3Log in to the login area with the "Technician" user and the technician password.
    4Access the "Components" menu area.
    5Click the "Add component" button.
    6In the "Position" drop-down list, set the position of the meter (feed-in point or consumption point). For more information on the position of the Fronius Smart Meter, see Positioning on page (→).
    7Click the "Add" button.
    8Click the "Save" button to save the settings.

    The Fronius Smart Meter is configured as a primary meter.

    1. Start-up
    2. Fronius GEN24 inverter

    Configuring the Fronius Smart Meter as a secondary meter

    1Access the inverter website.
    - Open the web browser.
    - In the address bar of the browser, enter the IP address (IP address for WLAN: 192.168.250.181, IP address for LAN: 169.254.0.180) or the host and domain name of the inverter and confirm.
    - The inverter website is displayed.
    2Click the "Device configuration" button.
    3Log in to the login area with the "Technician" user and the technician password.
    4Access the "Components" menu area.
    5Click the "Add component" button.
    6In the "Position" drop-down list, select the meter type (producer/load meter).
    7Enter the previously assigned address in the "Modbus address" input field.
    8Enter the name of the meter in the "Name" input field.
    9In the "Category" drop-down list, select the category (producer or load).
    10Click the "Add" button.
    11Click the "Save" button to save the settings.

    The Fronius Smart Meter is configured as a secondary meter.

    Technical data

    Technical data

    Modbus transmission speed: 9600 baud
    Parity bit: None
    Software version: Datamanager 3.7.2 / Energypackage 1.3.3

    Input

    Nominal voltage (1-phase)
    Operating range

    230 V
    ±10%

    Self-consumption - voltage path (max. voltage)

    4 VA (1.9 W) for 264 V

    Nominal frequency
    Tolerance

    50 - 60 Hz
    47 to 61 Hz

    Nominal current, lb

    10 A

    Maximum current, Imax

    63 A

    Starting current

    40 mA

    Short-time overload (EN/IEC 62053-21, EN/IEC 62053-23)

    30 lmax / 0.5 s

    Self-consumption - current path (max. current)

    1.5 W

    Power factor
    Operating range (EN/IEC 62053-21, EN/IEC 62053-23)

    cosφ 0.5 ind to 0.8 cap

    Current distortion factor

    In acc. with EN 62053-21

    Output

    Pulse output
    Optical relay with NO contact SPST-NO, floating

    Contact load

    110 V DC/AC - 50 mA

    Pulse value (programmable)

    1 imp/Wh - 10 Wh - 100 Wh - 1 kWh

    Pulse duration (programmable)

    50 - 100 - 150 - 200 - 300 - 400 - 500 ms

    RS485 communication
    Electrically isolated from measuring input

    Standard

    RS485 - 3 conductors

    Transmission

    Serial, asynchronous

    Protocol

    Compatible with Modbus RTU

    Addresses

    1 to 255

    Number of bits

    8

    Stop bit

    1

    Parity bit

    None - odd - even

    Baud rate

    2400 - 4800 - 9600 - 19200 bit/s

    Response time

    ≤ 200 ms

    Insulation (EN/IEC 62052-11, 62053-21)

    Installation category

    III

    Pollution level

    2

    Insulation voltage

    300 V

    Electromagnetic compatibility

    Emission test

    In acc. with EN/IEC 62052-11, EN 50470

    Immunity test

    In acc. with EN/IEC 62052-11, EN 50470

    Operating conditions

    Reference temperature

    23°C (±2°C)

    Operating range

    -25 to 55°C

    Temperature limit for storage and transport

    -40 to 70°C

    Tropical model

     

    Max. power loss (for thermal dimensioning of the switch cabinet)

    ≤ 4 W

    Mechanical environment
    Electromechanical environment

    M1
    E2

    Housing

    Housing

    2 modules according to DIN 43880

    Sealable front and terminal cover

     

    Connection

    Screw connection

    Mounting

    Can be snapped onto 35 mm DIN rail

    Housing material

    Polycarbonate, self-extinguishing

    Degree of protection (EN 60529)

    IP51 front, IP20 connections

    Weight

    250 grams

    Screw terminals

    Measuring input

    Wire (rigid)

    Min. 1 mm² / max. 16 mm²

    Wire (flexible)

    Min. 1 mm² / max. 10 mm²

    Recommended torque

    1.2 Nm / max. 1.4 Nm

    Output

    Wire (rigid)

    Min. 0.05 mm² / max. 4 mm²

    Wire (flexible)

    Min. 0.05 mm² / max. 2.5 mm²

    Recommended torque

    0.5 Nm / max. 0.8 Nm

    1. Technical data

    Technical data

    Modbus transmission speed: 9600 baud
    Parity bit: None
    Software version: Datamanager 3.7.2 / Energypackage 1.3.3

    Input

    Nominal voltage (1-phase)
    Operating range

    230 V
    ±10%

    Self-consumption - voltage path (max. voltage)

    4 VA (1.9 W) for 264 V

    Nominal frequency
    Tolerance

    50 - 60 Hz
    47 to 61 Hz

    Nominal current, lb

    10 A

    Maximum current, Imax

    63 A

    Starting current

    40 mA

    Short-time overload (EN/IEC 62053-21, EN/IEC 62053-23)

    30 lmax / 0.5 s

    Self-consumption - current path (max. current)

    1.5 W

    Power factor
    Operating range (EN/IEC 62053-21, EN/IEC 62053-23)

    cosφ 0.5 ind to 0.8 cap

    Current distortion factor

    In acc. with EN 62053-21

    Output

    Pulse output
    Optical relay with NO contact SPST-NO, floating

    Contact load

    110 V DC/AC - 50 mA

    Pulse value (programmable)

    1 imp/Wh - 10 Wh - 100 Wh - 1 kWh

    Pulse duration (programmable)

    50 - 100 - 150 - 200 - 300 - 400 - 500 ms

    RS485 communication
    Electrically isolated from measuring input

    Standard

    RS485 - 3 conductors

    Transmission

    Serial, asynchronous

    Protocol

    Compatible with Modbus RTU

    Addresses

    1 to 255

    Number of bits

    8

    Stop bit

    1

    Parity bit

    None - odd - even

    Baud rate

    2400 - 4800 - 9600 - 19200 bit/s

    Response time

    ≤ 200 ms

    Insulation (EN/IEC 62052-11, 62053-21)

    Installation category

    III

    Pollution level

    2

    Insulation voltage

    300 V

    Electromagnetic compatibility

    Emission test

    In acc. with EN/IEC 62052-11, EN 50470

    Immunity test

    In acc. with EN/IEC 62052-11, EN 50470

    Operating conditions

    Reference temperature

    23°C (±2°C)

    Operating range

    -25 to 55°C

    Temperature limit for storage and transport

    -40 to 70°C

    Tropical model

     

    Max. power loss (for thermal dimensioning of the switch cabinet)

    ≤ 4 W

    Mechanical environment
    Electromechanical environment

    M1
    E2

    Housing

    Housing

    2 modules according to DIN 43880

    Sealable front and terminal cover

     

    Connection

    Screw connection

    Mounting

    Can be snapped onto 35 mm DIN rail

    Housing material

    Polycarbonate, self-extinguishing

    Degree of protection (EN 60529)

    IP51 front, IP20 connections

    Weight

    250 grams

    Screw terminals

    Measuring input

    Wire (rigid)

    Min. 1 mm² / max. 16 mm²

    Wire (flexible)

    Min. 1 mm² / max. 10 mm²

    Recommended torque

    1.2 Nm / max. 1.4 Nm

    Output

    Wire (rigid)

    Min. 0.05 mm² / max. 4 mm²

    Wire (flexible)

    Min. 0.05 mm² / max. 2.5 mm²

    Recommended torque

    0.5 Nm / max. 0.8 Nm

    1. Technical data

    Fronius manufacturer's warranty

    Detailed, country-specific warranty terms are available on the internet:
    www.fronius.com/solar/warranty

    To obtain the full warranty period for your newly installed Fronius inverter or storage system, please register at: www.solarweb.com.