﻿WEBVTT FILE

Step 1
00:00:08.000 --> 00:00:19.000 line:16 position:50% align:center size:100%
Observe the local regulations for lifting heavy loads or use a crane to lift the device (attach to crane-hoisting lugs)

Step 1
00:00:19.000 --> 99:59:59.999 line:16 position:50% align:center size:100%
To attach the inverter to the mounting bracket, use only the screws included in the scope of delivery.